MAISON FONCEN
ENQUIRE
Concept Study

Luxury Hotel

THE MERIDIAN GRAND

Design study — not presented as a completed installation.

Singapore
Triple-height Singapore hotel lobby with a 36-column crystal chandelier

Project Introduction

The Vision

A precise matrix of thirty-six luminous crystal columns gives a triple-height Singapore lobby a memorable centre, balancing monumental scale with clarity, rhythm and restrained champagne-gold detailing.

The Meridian Grand is envisioned as a study in measured verticality. Thirty-six crystal columns descend through the triple-height volume as an ordered field, giving the arrival sequence a clear identity without interrupting long views across the lobby.

The composition is designed on a six-by-six grid with subtle variation in suspension height and illumination. Clear elongated crystals and a fine champagne-gold frame create presence through repetition, proportion and controlled reflection rather than ornament.

Project Facts

Location
Singapore
Project Type
Luxury Hotel
Lighting Scope
36-column crystal lobby matrix
Interior Style
Contemporary international hospitality
Architecture / 01

The Space

Tall stone walls, broad glazing and generous circulation establish an international hospitality interior with strong architectural scale. The central void asks for a luminous landmark that can be understood immediately from the entrance, upper galleries and exterior approach.

Illumination / 02

Light in Architecture

The regular ceiling frame aligns with the lobby geometry while the suspended columns introduce depth below it. Warm internal light reveals each crystal profile, allowing the matrix to remain legible in daylight and become more dimensional as evening ambient levels fall.

Concept Development / Visual Study

Blue-hour light reveals the crystal matrix as the centre of the arrival sequence.
Thirty-six suspended columns establish a precise rhythm through the triple-height lobby.
Elongated clear crystal facets create controlled highlights without excessive sparkle.
Champagne-gold framing and cable joints express the system’s disciplined engineering.

Project Support

From Concept to Delivery

Typical Response Time: Within one business day

Explore Our Craftsmanship

Bespoke project support

Develop Your Lighting Concept

Share your space dimensions, design direction and performance requirements with our project team.

Start a Similar Project
LET'S TALK